Esperance Ports Land & Sea

We have been employed by the Esperance Port  to undertake all of their survey work for the past twelve years. Before and currently we were and are  also engaged by various contractors working for the port.

Past and current contractors include 

  • Barclay Mowlem during the train tipper construction
  • Jesz Flemming & Assoc. for dredging, land reclamation and quarry survey
  • Roadstone for quarry survey
  • John Holland for rail survey
  • Black Swan Nickel, Lion Ore Australia, Magellan Metals, Portman Iron Ore (stock surveys)
  • CBH (upgrade road networks)
  • ITC (preliminary woodchip survey)
  • Kerman Contracting (various sheds and structures)
  • Burns Roe Worley (power station, road, cable route, as constructed)
  • Portman Iron Ore (rail surveys, rail tipper deformation surveys)
  • ONYX Projects (Survey RCD vault)

Some of the work undertaken directly for the port includes;

  • Survey of underside of berth 2
  • Setout of access road around sulphur shed and through to exit on south side of port
  • Survey of Esperance Port Authority new boundaries after 3rd berth land reclamation (instructed by LANDGATE)
  • Ascon and set out of new lead shed
  • Various drainage surveys
  • Survey of retaining wall and access along CBH road
  • Survey of new boundaries for port expansion for woodchip plant

Esperance Surveys have been involved in surveying the following Special Survey Area (SSA) subdivisions;

 SUBDIVISION – SHORESANDS (200 LOTS, ESPERANCE)

Residential Stages 1-4 (140 lots) have all had final pegging completed. Esperance Surveys are engaged as surveying consultants by the developer to undertake surround surveys, pre-calculation  plan, set-out of all earthworks, roads and other services, as constructed surveys as required, final pegging of lots, clearing conditions, lodgement of DP and have plan placed ‘In Order for Dealings’ at LANDGATE.

 

SUBDIVISION – LE GRAND ESTATE (260 LOTS, ESPERANCE)

Residential Stages 1-7 (260 lots),  have all had final pegging completed. Stage Esperance Surveys are engaged as surveying consultants by the developer to undertake surround surveys, pre-calculation  plan, set-out of all earthworks, roads and other services,  as constructed surveys as required, final pegging of lots, clearing conditions, lodgement of DP and have plan placed ‘In Order for Dealings’ at LANDGATE.

 

SUBDIVISION – MARYANNE WATERS (200 LOTS, HOPETOUN)

Residential Stage 1-3 (130 lots), have all been completed including issue of titles. Esperance Surveys are engaged as surveying consultants by the developer to undertake surround surveys, pre-calculation plan, set-out lot frontages, as constructed surveys as required, final pegging of lots, clearing conditions, lodgement of DP and have plan placed ‘In Order for Dealings’ at LANDGATE.

 

OTHER SIGNIFICANT PROJECTS:

Main Roads Western Australia -

Esperance Surveys were employed to undertake cadastral, road works, set out for construction, topographic, volume, Survey audit services for road construction and alignment control surveys in the Esperance District . Prior to 1999 Esperance Surveys were employed by MRWA to set out roads for construction and provide survey audits of build roads. Esperance Surveys have also undertaken many digital ground surveys and significant flood data surveys under the instruction of MRWA.

 

Roxby Downs Mine -

Greg Thomas was employed on a contract basis to undertake check surveys on construction of processing plant.

 

Channar Mine -

Greg Thomas was employed on a contract basis to undertake check surveys on construction of mine site and conveyors.

 

Rail Tipper, Esperance Wharf -

Esperance Surveys were employed to set out all aspects of the rail tipper on behalf of Barclay Mowlem.

 

Jinker Ramp, Bandy Creek Boat Harbour, Esperance. -

Esperance Surveys were employed to setout earthworks, concrete works and rock batter works on behalf of Tyson Construction.

 

Fertiliser Storage Building, Esperance -

Esperance Surveys were employed to undertake topographic surveys, volume calculations, setout of concrete and holding down bolt positions and as constructed surveys of services by United Farmer Co-Operative.

CBH Constructions -

Esperance Surveys were employed to setout various structures by contractors employed by CBH. Structures included storage pads, conveyors, Q & X type storage bins and site drainage works. Also engaged on as constructed surveys and drawings.

 

Urban Subdivisions -

Esperance Surveys have been involved in the project management, earthworks, road and sewer design for several large residential and industrial subdivisions within Esperance townsite. Works included as constructed on sewer, road and drainage.

 

Photo Control Projects -

Esperance Surveys have undertaken projects for LANDGATE relating to the placement of photo control and subsequent levelling and GPS positioning of control. We have also undertaken such projects on behalf of contractors employed by Water Corporation.

 

Water Corporation -

Survey of new boundaries for Water Corporation Waste Water Ponds at Wylie Bay.

Feature and contour survey proposed Waste Water Treatment Plant at Wylie Bay.

Feature and contour survey sewer pressure main corridor Esperance WWTP to Castletown.

 

Rail Surveys -

Survey of existing features and contours for Brookfield Rail. Set out civil and rail works for John Holland including ascon surveys

 

Bridge Surveys -

Survey of existing features and contours for BG & E on Sims Street Bridge in Esperance. Set out of civil and construction works and as cons for Georgiou.

Numerous LANDGATE, local government and other government authority land surveys in the Esperance, Ravensthorpe and Norseman Districts over the past 19 years.

 